Yusco case study: powering a fast-growing French charging network
Yusco is a French charge point operator specializing in destination charging. It deploys and operates AC, DC and ultra-fast stations on the car parks of retail brands such as Auchan, Decathlon and Leroy Merlin, and runs the Le Plein network, ranked France's number one charging network in Chargemap's 2026 ranking.
Growth at that pace puts pressure on the software underneath. Solidstudio supplies and continuously develops the CPMS behind the network, in an ongoing partnership where both teams shape the roadmap together.
This six-page case study shows how we brought Plug & Charge to Yusco's chargers, opened the network to other drivers through e-roaming, and kept the platform fast and affordable as session data piled up. Leave your email and we will send you the PDF.
What you'll learn
- How Plug & Charge went from a demonstrator on Alpitronic chargers to every ultra-fast Yusco charger, using GIREVE and SECC certificates
- How OCPI integrations with GIREVE, Octopus Electroverse and peer-to-peer connections open a network to drivers from other services
- How to keep a database stable and a platform responsive as meter readings and authorisation events pile up
- How architecture reviews and audits protect a growing network from rising database load and infrastructure cost
- How running several OCPP, OCPI and Plug & Charge integrations in parallel works with partners that each have their own protocols, certificates and timelines
- Why the working model is a technical partnership with a fortnightly review, not a fixed-scope project





