Ebook

Platform Migration: The Ultimate Guide for EV Charging Businesses

Migration has a reputation for being painful. It doesn't have to be. Done right, side by side with your current system, in controlled batches and with rollback available at every step, you can move a live network without taking it offline.

The guide comes in two editions: one for operators running a vendor's CPMS and one for operators who built their own. Pick yours in the form and we'll send the right PDF.

What you'll learn

  • When to move: the signals that your current platform, bought or self-built, is holding the network back
  • What a platform worth migrating to looks like, and how to choose a provider
  • The migration process step by step, with a checklist for moving a live network in controlled batches
  • OCPP acceptance testing for a whole charging network, with full test tables
  • What eMSPs should focus on when migrating driver-facing apps
  • Case study: how Connected Kerb moved 9,000 sockets to a new platform with zero downtime